Continuous Updates on Agile Business Complex Project
In the heart of the New Administrative Capital, the Agile Business Complex stands as more than just a building—it is a fully integrated business hub combining modern design, superior quality, and investment-oriented features. At Radix Development, we prioritize client satisfaction and continuous communication to ensure that stakeholders are kept up-to-date with the latest progress. We also maintain regular follow-ups on construction works to ensure delivery of a project that fulfills our promises and exceeds client expectations. This article highlights the latest construction updates for AGILE Project.
Brief Overview of Agile Business Complex
Agile Business Complex is one of the leading projects in the New Administrative Capital, developed by Radix Development in line with the latest real estate trends and investment opportunities in the Egyptian market. The project represents one of the most significant mixed-use developments (MIXED USED) for many clients.
-
Strategic Location: Downtown area, New Administrative Capital.
-
Total Area: 7,444 m².
-
Structure: 2 basement floors, ground floor, and 13 repeated floors.
-
Design & Execution: Main construction by UCAC, design supervision by IEC, and engineering consultancy by Archrete.
Unique Features of RAY:
-
Diverse Activities: Commercial units on the ground and first floors, with clinics and administrative units on repeated floors.
-
Flexible Design: Administrative units designed for all business types, some with private bathrooms for enhanced convenience.
-
Code-Compliant Design: All interior units, fire protection, lighting, and central AC systems are designed according to international codes and standards, ensuring a fully equipped and safe working environment.
Agile Business Complex combines quality construction with strategic location, making it a secure and promising investment.
Agile Project Construction Updates
Concrete Works
Concrete works are progressing excellently, with formwork for the 12th floor slab currently underway. This ongoing progress ensures timely project delivery.
Architectural Finishes
Building Works:
-
Completed floors: Ground to 8th, plus 60% of the upper basement.
-
Current works: 9th floor building works in progress.
Plastering Works:
-
Ongoing on floors 3–6.
Waterproofing Works:
-
Completed: Bathrooms on 3rd and 4th floors.
-
Ongoing: Basement tanks waterproofing to ensure maximum protection.
Painting Works:
-
Completed: Upper basement ceiling.
-
Ongoing: Wall finishes and lower basement painting.
Mechanical and Electrical Systems
-
Initiation of all main systems on the 3rd floor, including:
-
Electrical and lighting systems.
-
Fire-fighting systems.
-
Central AC systems.
-
-
All works are implemented according to the latest international codes and standards for maximum efficiency and safety.
Exterior Façades
-
Building As-Built drawings have been completed.
-
Currently preparing Shop Drawings for the façades to commence exterior finishing works, giving the complex its distinctive appearance.
The Agile Business Complex represents an unparalleled investment opportunity due to its strategic location, engineering design, and ongoing construction progress. Multiple phases have been completed, with work continuing to ensure delivery of high-quality units fully compliant with modern engineering standards and real estate requirements.
For inquiries, please contact the hotline: 1923
And you can know more information about Recent Developments in Ray Residence Project