Recent Developments in Ray Residence Project

Publication cover
Category:  Real Estate
Date:   August 2025

Recent Developments in Ray Residence Project

Radix Development has launched its distinguished residential project, Ray Residence, representing a new concept of modern living within a smart and sustainable community. The project provides all the real estate features and amenities clients seek to ensure a luxurious lifestyle, in addition to being an unparalleled investment opportunity. It is located in one of the most prestigious areas of the New Administrative Capital, near key vital locations, services, and facilities. The project combines innovative designs with natural elements and aesthetic features such as landscaping and green areas that harmonize with surrounding elements, alongside fully integrated facilities that meet all residents’ needs.

Overview of Ray Residence Project

Ray Residence Compound is one of the most prominent residential projects in the R8 District of the New Administrative Capital. It is designed to provide a comprehensive living experience that combines comfort, luxury, and beauty.

  • Location: Plot O1, R8 District, New Administrative Capital.

  • Total Area: 27 acres (112,243.25 m²).

  • Number of Buildings: 40 residential buildings.

  • Building Design: Each building consists of a ground floor plus 7 repeated floors (G+7).

  • Number of Units: Approximately 1,100 residential units.

  • Finishing Status: Units delivered as Core & Shell, with optional finishing styles available upon request.

Construction Updates – Ray Residence

The RAY Project has shown significant progress during 2025, entering a crucial phase where the first concrete structures of the building are taking shape. This report highlights the key achievements and developments on-site, detailing the progress across various construction aspects.

Superstructure Works

Concrete Structure and Slabs (A1):

  • Current Status: Ongoing construction of the building’s concrete structure.

  • Details: Work continues with completion of the lower basement slab and initiation of reinforced concrete work for the ceiling.

Ramps and Accessories (B1):

  • Current Status: Concrete ramp works are nearing completion.

  • Details: Ramp construction is being finalized, along with pile cap preparations.

Vertical Elements Preparation (C1):

  • Current Status: Preparations underway for the first vertical elements.

  • Details: Preparatory work includes constructing the retaining wall, critical for supporting excavation sides and surrounding soil. Simultaneously, the staircase and elevator shaft/core structures are being prepared, forming the building’s essential service core.

Ramps (D1):

  • Current Status: Basement ramp construction is in progress.

Vertical Circulation Cores (C10):

  • Current Status: Construction of staircase and elevator walls underway, preparing for concrete pouring.

Foundation and Pre-Construction Works

Soil Preparation and Leveling (C2):

  • Current Status: Ground leveling at the excavation base is in progress.

  • Details: Soil is being leveled and compacted mechanically (mechanical compaction) to enhance density and load-bearing capacity, reducing potential future settlement. This step prepares the site for concrete pouring of blinding layers and foundations.

Upper Reinforcement for Foundations (C9):

  • Current Status: Final stages of reinforcement/rebar installation for foundations.

  • Details: Upper reinforcement bars are installed precisely according to structural drawings. This rebar network resists tensile stresses in concrete. Preparations are ongoing for formwork/shuttering installation and subsequent concrete pouring.

Phase Two: Foundations and Pre-Construction Works

This phase is the cornerstone of the project, ensuring long-term stability and safety.

Excavation and Leveling (Phase 2):

  • Current Status: Excavation work is underway for the second phase.

  • Details: Surface soil layers are being removed to reach the design foundation level. Excavation depth is carefully controlled to ensure the building rests on soil capable of safely bearing structural loads.

Construction continues at an accelerated pace, from completing final foundation stages to initiating the first vertical and horizontal elements. All works are executed according to the highest quality standards to meet engineering requirements. Construction remains ongoing to ensure timely completion of all phases.

For inquiries, please contact the hotline: 19238